Major Difficulties
Interconnect (Myrinet) problems (2 PY)
- GM mapper limitations (2 PM)
- Each new cluster exceeded the number of nodes the mapper could handle
- Non-deadlock-free routes (4 PM)
- Code for routing algorithm gave only shortest path routes
- Reliability
- Error detection/correction (6 PM)
- Switch diagnostics capture and display (1 PY)